BACK
Position:Home > English > News > Company news >
Points for attention in installation, operation and maintenance of Marine motor
Time:2018-08-22 17:07 Share:

  Points for attention during installation, operation and maintenance of Marine motor:

  1. It should be noted that the hoist on the generator is only applicable to the hoist generator (single machine) and cannot be used to lift the entire unit, otherwise it may cause personnel injury and equipment damage;

  2. Force cannot be applied on the fan of Marine motor, and the generator must not be pulled by fan, otherwise serious personal injury and equipment damage may be caused;

  3. Before maintenance, all power supply should be cut off and all control lines should be cut off to prevent accidental start of the generator;

  4. Properly grounded in accordance with local and national electrical regulations;

  5. Whenever the Marine motor is running, it is always deemed that it has voltage and is disposed. Even if the fuse of the regulator is removed, there is residual magnetic voltage at the outgoing end of the generator and the connecting end of the regulator.

  6. When solvents, detergents or combustible liquids are present, good ventilation is required to prevent fire, explosion and health hazards. Harmful gases should be avoided.

  7. Marine motor shall take measures to prevent rainwater and seawater from entering the generator;

  8. During troubleshooting, safety facilities may be removed due to the protective cover so that operators can approach, operate or test, so special care must be taken!